Hi,
I'm working on setting up our loop and wonder what the best way is to plumb the 2 zone tanks. I'm running the supply header and "T"ing off with 2 solenoid valves (one for each zone). What about the return? Should I come off each zone individually up to the return header or can I connect from the lower zone return to the upper zone return and continue up to the return header?
thanks,
e
I'm working on setting up our loop and wonder what the best way is to plumb the 2 zone tanks. I'm running the supply header and "T"ing off with 2 solenoid valves (one for each zone). What about the return? Should I come off each zone individually up to the return header or can I connect from the lower zone return to the upper zone return and continue up to the return header?
thanks,
e
Comment