Hello all,
I am looking at setting up a production brewery with 1st year annual capacity of about 1million litres. Double that by the third year. This brewery will bottle and keg with flash pasteurizer. Stream boiler and glycol cooling for unitanks. Regardless of the industrial zone I select, I will still need to upgrade the 3-phase power supply to the brewery. I would really like to do this only once. I would be grateful if anybody could recommend a level of power that would satisfy such a production capacity. The only text reference I have is from Kunze, "Technology Brewing & Malting", where 10 to 14 kWh of electrical energy/hl is stated.
Any advice would be appreciated.
sincerely
brendf
I am looking at setting up a production brewery with 1st year annual capacity of about 1million litres. Double that by the third year. This brewery will bottle and keg with flash pasteurizer. Stream boiler and glycol cooling for unitanks. Regardless of the industrial zone I select, I will still need to upgrade the 3-phase power supply to the brewery. I would really like to do this only once. I would be grateful if anybody could recommend a level of power that would satisfy such a production capacity. The only text reference I have is from Kunze, "Technology Brewing & Malting", where 10 to 14 kWh of electrical energy/hl is stated.
Any advice would be appreciated.
sincerely
brendf
Comment