we just had 4-5 inches of concrete poured with grade for our new space with a 5 inch high x 5 wide burm around the complete area. its floating on existing concrete with a sand base pitching to 3 floor drains (we could not do trench because of the warehouse space basement below)
they came and cut stress joints about 1 inch deep for cracking (like basement style). so now what do we do??? anyone have suggestions as to what to fill these joints with as well as the edge between the burm and new floor?
also sealing it or just leave it concrete we are tidy brewers (well best you can be)
just poured two days ago so its got some cure time ahead of it and we are on an extremely taxed startup budget at this point.
thanks in advance
they came and cut stress joints about 1 inch deep for cracking (like basement style). so now what do we do??? anyone have suggestions as to what to fill these joints with as well as the edge between the burm and new floor?
also sealing it or just leave it concrete we are tidy brewers (well best you can be)
just poured two days ago so its got some cure time ahead of it and we are on an extremely taxed startup budget at this point.
thanks in advance