My partner and I are planning on setting up 3 150 gallon plastic fermenters and building a box around them with rigid insulation similar to Jonnymax. http://discussions.probrewer.com/sho...hlight=coolbot We may even just build one box with an AC and Coolbot then move it to each fermenter to keep costs down at first. I feel pretty confident this will work and it is very affordable. About $500 for 5 pieces of 8'x4'x1" rigid insulation, a 5000 btu AC, and a coolbot.
We are planning on opening with 3 beers and we are going to serve them out of 3 brite tanks. We may not be able to afford jacketed brites and a chiller so we are looking at building a cold room for our three serving vessels and kegs. I would like to build a cold room myself and install an AC with a coolbot. My only concern is that an inspector might not let this fly. Has anyone in the Portland area had success setting up a cold room with a Coolbot and passed the health inspection?
Thank You,
Andy
We are planning on opening with 3 beers and we are going to serve them out of 3 brite tanks. We may not be able to afford jacketed brites and a chiller so we are looking at building a cold room for our three serving vessels and kegs. I would like to build a cold room myself and install an AC with a coolbot. My only concern is that an inspector might not let this fly. Has anyone in the Portland area had success setting up a cold room with a Coolbot and passed the health inspection?
Thank You,
Andy
Comment