I have been searching for a plate and frame heat exchanger for new 10 barrel system. I have contacted a few places but it's not so easy to compare. I have estimates from
Any ideas on what I actually need or what most are using?
I will have approximately 600 gal CLT so I think I will only need a single stage unit.
CLT temp ~38°F
45-60 minute transfer to fermenter, I assume that is the industry average?
option to get down to 50°F for lagers but will mostly do ales.
Thanks for the tips
Jason
- Alfa Lavel
- SPx Flow
- Thermaline
Any ideas on what I actually need or what most are using?
I will have approximately 600 gal CLT so I think I will only need a single stage unit.
CLT temp ~38°F
45-60 minute transfer to fermenter, I assume that is the industry average?
option to get down to 50°F for lagers but will mostly do ales.
Thanks for the tips
Jason