We have a 7BBL CDC system with (4) 7BBL cone bottom fermenters. The glycol jackets are the banded version (think a bumble bee) and cover no more than 60% of the tank. The run from our current glycol unit to our tanks is around 40 feet of 1/2 inch pvc and copper piping. We've just brewed our first two batches and can tell the system we purchased is very undersized. It takes days to crash one tank with the other tank simply maintaining 70 degrees. I need advice on what size system would work for us. I'm sure there's more info you require from me to give any recommendations so I've included my phone number below. Any help would be much appreciated as I trust this website much more than a plumber or refrigerator repairman who would try to sell me the most expensive chiller possible.
-Brad Veltman