I know there are a ton of variables and depends on the state and local inspector but I'm wondering if anybody has ever run into problems trying to get approval for a brewery without floor drains. Of course I would like to have them but the building we wish to lease has in-floor heat and can't cut into the floor to install a drain.
Thanks,
Chris
Thanks,
Chris
Comment