Hey everyone,
We are about to treat our floors for the production area. We already have our drain system in place. All of our water and electrical will be running down from the ceiling to where it needs to go. My question is before we drop thousands of dollars on treating 10,000 square feet with Ucrete, is there anything you would reccomend I double check?
Am I forgetting something that I should do before we put our floors down?
Is there something that you wish you'd done before you put the floors in?
Last thing I want to do is coat the floor and then have to redo it later because we forgot something simple.
Thanks
We are about to treat our floors for the production area. We already have our drain system in place. All of our water and electrical will be running down from the ceiling to where it needs to go. My question is before we drop thousands of dollars on treating 10,000 square feet with Ucrete, is there anything you would reccomend I double check?
Am I forgetting something that I should do before we put our floors down?
Is there something that you wish you'd done before you put the floors in?
Last thing I want to do is coat the floor and then have to redo it later because we forgot something simple.
Thanks
Comment