    Originally posted by ScottV
    Well day two went well. We cut all the remaining slab, and jack hammered all the concrete. All we have to do now is remove the concrete and about 8" of dirt before we can rebar and repour. Here are some pics.

    thanks for all your help. I will post some finished pics next week.

    I can't upload the pics, they are to large. If anyone wants to see them just send me an email scottvaccaro@optonline.net.


    Scott
    How did this turn out? We cut up the concrete floor this week to install a drain and it has mesh wire with 4" concrete.

    What about getting tanks fabricated with legs that would disperse the load better? Something that would have the same effect as putting the metal sheet underneath.