Folks
Wondering if any of you out there would be so kind as to take a look at my proposed floor plan for a space I'm looking at moving in to. This is on the first floor of an old textile mill which is being renovated by a new owner. Both the building owner and the town I'm in are advertising for a brewery to move in, both to the town in general and this place specifically.
The landlord is going to white box the premises, including installation of the bathrooms, HVAC etc and getting the building signed off per code. My parts will be the actual brewing and tap room parts.
So far I have a good sized cold room, 3bbl 3-vessel brewhouse with 2x 3bbl tanks and 2x 7bbl tanks, a small office space, space for additional tanks, and plenty of room for storing pallets of kegs, grain etc. The existing vault marked on the plan is about 50sqft and is part of the original building, back when everyone got paid cash at the end of the week. Plan is to use it for long term aging of stuff, either bottles or a couple of barrels would fit nicely too.
It's planned out so that a single person working at the bar should be able to see pretty much everything. I believe that I have the necessary separation of the production area from the tap room. Initial plans are to serve from kegs in the walk in (tax determined area not yet marked) and hopefully switch up to serving tanks as cash-flow allows. Plans are for 95% of the sales through the taproom, with the occasional sixtel or half barrel out to a local tap or two to generate interest.
Anyways, floor plan as follows:
Wondering if any of you out there would be so kind as to take a look at my proposed floor plan for a space I'm looking at moving in to. This is on the first floor of an old textile mill which is being renovated by a new owner. Both the building owner and the town I'm in are advertising for a brewery to move in, both to the town in general and this place specifically.
The landlord is going to white box the premises, including installation of the bathrooms, HVAC etc and getting the building signed off per code. My parts will be the actual brewing and tap room parts.
So far I have a good sized cold room, 3bbl 3-vessel brewhouse with 2x 3bbl tanks and 2x 7bbl tanks, a small office space, space for additional tanks, and plenty of room for storing pallets of kegs, grain etc. The existing vault marked on the plan is about 50sqft and is part of the original building, back when everyone got paid cash at the end of the week. Plan is to use it for long term aging of stuff, either bottles or a couple of barrels would fit nicely too.
It's planned out so that a single person working at the bar should be able to see pretty much everything. I believe that I have the necessary separation of the production area from the tap room. Initial plans are to serve from kegs in the walk in (tax determined area not yet marked) and hopefully switch up to serving tanks as cash-flow allows. Plans are for 95% of the sales through the taproom, with the occasional sixtel or half barrel out to a local tap or two to generate interest.
Anyways, floor plan as follows: