Page 1 of 5 123 ... LastLast
Results 1 to 15 of 62

Thread: 5BBL, 10BBL, 20BBL, 30BBL beer conical fermenter/unitank for sales

  1. #1
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900

    5BBL, 10BBL, 20BBL, 30BBL beer conical fermenter/unitank for sales

    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Name:  QQ??20171208161554.jpg
Views: 255
Size:  98.0 KB
    Name:  1000L beer fermenter.jpg
Views: 254
Size:  93.4 KB
    Name:  QQ??20171116133041.jpg
Views: 258
Size:  91.4 KB
    Name:  QQ??20170404164646.jpg
Views: 246
Size:  93.3 KB
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  2. #2
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Name:  QQ??20171208161554.jpg
Views: 255
Size:  98.0 KB
    Name:  1000L beer fermenter.jpg
Views: 254
Size:  93.4 KB
    Name:  QQ??20171116133041.jpg
Views: 258
Size:  91.4 KB
    Name:  QQ??20170404164646.jpg
Views: 246
Size:  93.3 KB[/QUOTE]
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  3. #3
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  4. #4
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  5. #5
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  6. #6
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  7. #7
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  8. #8
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)[/QUOTE]
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  9. #9
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  10. #10
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  11. #11
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  12. #12
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  13. #13
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  14. #14
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

  15. #15
    Join Date
    Mar 2017
    Location
    Jinan, China
    Posts
    1,900
    working pressure: 2bar, testing pressure: 3bar,
    Jacket working pressure: 1bar, testing pressure: 2bar,
    Inner tank thickness: 3mm, outer cladding: 2mm,
    Cone thickness: 4mm, domed top thickness: 4mm,
    Polyurethane insulation, thickness: 100mm, side and bottom insulated,
    Dimple plate cooling jacket ,
    Cooling stage: cylinder and cone
    Two temp control stage
    Exterior: stain removed and brightened on regular margin
    Interior surface: Polished, and welding joint acid clearned
    Roughness: 0.4um Domed top, 60 degree cone angle
    4 pcs stainless steel leg, with adjustable leg bolt Top fittings,
    CIP arm, spray ball, side/top manhole, Side fittings: Glycol inelt/outlet,
    thermo well, sample port,
    Bottom fittings: Drain valve, beer outlet, carbonation unit (optional),
    thermo well CIP arm including pressure guage,
    Mechanical pressure valve mounted with CIP arm ,
    Dry hopping port on top (optional)
    Best regards
    Suri Lee(Sales Director)
    Email: suri@sdyueshengbrew.com
    Shandong Yuesheng Beer Equipment Co., Ltd
    www.ysbeerequipment.com
    Tel:86-531-88707611
    Mobile:86-17753172875
    Whatapp:86-17753172875
    Skype:wfhengan06
    facebook: suri062925

Page 1 of 5 123 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •