Hey all...sorry for the newbie post here.
We're building out a 2x7BBL Brite Tank system here to produce a sparkling fruit juice product. A lot of the equipment seems to overlap with the Brewery Industry.
So I've ordered and received:
-7BBL Jacketed Apex Brewing Brite Tanks (2 of them)
-5 Ton Glycol Chiller from Cold Shot
-Meheen M6 Filler
-60 Gallon Southbend Kettle
What I need next is some direction on who to hire to "connect" all these pieces together. I've got electrical and drains done...just don't know who the next contractor is to connect chiller to brites and brites to filler/kettle...
Any advice is greatly appreciated!
Josh
We're building out a 2x7BBL Brite Tank system here to produce a sparkling fruit juice product. A lot of the equipment seems to overlap with the Brewery Industry.
So I've ordered and received:
-7BBL Jacketed Apex Brewing Brite Tanks (2 of them)
-5 Ton Glycol Chiller from Cold Shot
-Meheen M6 Filler
-60 Gallon Southbend Kettle
What I need next is some direction on who to hire to "connect" all these pieces together. I've got electrical and drains done...just don't know who the next contractor is to connect chiller to brites and brites to filler/kettle...
Any advice is greatly appreciated!
Josh
Comment