Our FVs will be installed against the wall. We are self installing Coolfit and looking to Dave on install and to make it easier to install. We are going to be in a new building with 20' ceilings and the wall is concrete masonry units 12' up then switches to drywall to the ceiling.
We are wondering if we could install the glycol headers behind the tanks on the concrete wall. This would be lower than the tank height.
We are starting with 10 BBL vessels, but hope to up size in the future.
Are we going to cause problems now or in the future to put the headers behind the tanks?
Thank you