I'm in the process of upgrading to a 7bbl brewing system. There's been a couple of delays and I need to make some beer.
I have a 3 keg brew magic system that I want to brew like 10 - 15 batches on to put in a 7 bbl fermenter.
Details:
Yield per small batch: ~12 gallons
Beer type: 4.7 %ABV belgian pale ale
Yeast: 1.5L pitch WLP530
Was planning on maybe 5 batches a day over 3 days, pitching the yeast at the end of the 1st day.
Can/Should I do this?
Thanks,
Paul
I have a 3 keg brew magic system that I want to brew like 10 - 15 batches on to put in a 7 bbl fermenter.
Details:
Yield per small batch: ~12 gallons
Beer type: 4.7 %ABV belgian pale ale
Yeast: 1.5L pitch WLP530
Was planning on maybe 5 batches a day over 3 days, pitching the yeast at the end of the 1st day.
Can/Should I do this?
Thanks,
Paul
Comment