Our tap room just opened and we are currently running a Wed. - Sat. schedule (closed Sun, Mon, Tue).
I'm wondering if we should be closing valves on our tap system when we're closed for several days (or even overnight from one day to the next?)
Our system is a single 50# co2 bottle feeding a 4-channel manifold (each channel has a shut-off valve).
Each manifold channels feeds two taplines - each with it's own regulator and shut-off valve.
So I have a number of places where I could close things up if need-be.
Any recommendations on best practices for times the taproom is closed?
I'm wondering if we should be closing valves on our tap system when we're closed for several days (or even overnight from one day to the next?)
Our system is a single 50# co2 bottle feeding a 4-channel manifold (each channel has a shut-off valve).
Each manifold channels feeds two taplines - each with it's own regulator and shut-off valve.
So I have a number of places where I could close things up if need-be.
Any recommendations on best practices for times the taproom is closed?
Comment