    Am in cost projection phase and wondering if could get some gut checks on the below. This is a cold shell new warehouse, and renting 6.3k sqft. Right now assuming new 10bbl steam system (not buying directly from China), taproom only (no food sales except food trucks or people bringing their own food). No distribution, strictly taproom sales. Seating capacity of 150, brewhouse/cellar space/grain/mill/keg cleaning/boiler of 2k sqft, coldroom space of 1k sqft. 6 beers on tap

    Below are just the initial buildout/service/brew equipment costs. I have no quotes outside of research, and many of the construction costs are complete stabs in the dark right now - e.g. is $50k anywhere in the ballpark for a simple 2-stall bathroom buildout, is the overall cost ($567k) way under-budget for a cold shell (a wall is up on one side, but not the other).

    Edit: this is the northern VA area, so assuming prices a bit on the higher end.

    Appreciate any help

    Name:  Costs1.PNG
Views: 514
Size:  30.0 KB
    Name:  costs2.PNG
Views: 512
Size:  11.9 KB
    Name:  costs3.PNG
Views: 515
Size:  17.9 KB
    Attached Images Attached Images  

  2. #2
    Join Date
    Jun 2010
    Posts
    346
    It is hard to tell you what the cost is going to be of trades like plumbing, electrical...

    To my opinion sometimes you are low like mill and sometimes you are high like auger.

    This is my rule of thumb. Put down all the expenses you think you are going to have. Then multiple that number by 1.5 to barely fit in the actual cost and by 2 to be comfortable.

    Good luck

  3. #3
    Join Date
    Feb 2019
    Location
    Caledon, Ontario, Canada
    Posts
    10

    Good Rule

    Quote Originally Posted by Thirsty_Monk View Post
    It is hard to tell you what the cost is going to be of trades like plumbing, electrical...

    To my opinion sometimes you are low like mill and sometimes you are high like auger.

    This is my rule of thumb. Put down all the expenses you think you are going to have. Then multiple that number by 1.5 to barely fit in the actual cost and by 2 to be comfortable.

    Good luck

    This is a very good rule of thumb, no matter how much you break it down, it will cost more than you think. You've done an excellent job on these breakdowns but like the poster above said, double it and that's your gut check. IF you can swing that amount of money, you're probably good!

  4. #4
    Join Date
    Oct 2017
    Location
    Fairfax, VA
    Posts
    13
    Thanks guys for looking over and the advice!

  5. #5
    Join Date
    Apr 2017
    Location
    San Antonio
    Posts
    18
    Not including equipment our build-out cost for a 2000sf brewery/taproom was about $225k. For a 6000sf location I would say your non-equipment cost is what your total is right now ~$550k.

  6. #6
    Join Date
    May 2009
    Location
    Huntsville, AL
    Posts
    238
    Please explain, someone, how a couple of bathrooms cost $50k.

  7. #7
    Join Date
    Sep 2017
    Location
    Denver, CO
    Posts
    6
    Quote Originally Posted by BeerBred View Post
    Please explain, someone, how a couple of bathrooms cost $50k.
    Plumbing, Electrical, possibly drains, all that stuff costs a ton of money, and that's before fixtures. Plus, number of toilets, etc is based on taproom capacity so if there's a large taproom, that's extra of all that.

  8. #8
    Join Date
    May 2009
    Location
    Huntsville, AL
    Posts
    238
    Quote Originally Posted by mgustafson View Post
    Plumbing, Electrical, possibly drains, all that stuff costs a ton of money, and that's before fixtures. Plus, number of toilets, etc is based on taproom capacity so if there's a large taproom, that's extra of all that.
    Ya I know. It was more of a rhetorical question. They were $40K a decade or two ago. but... Fixtures-home depot, couple grand. Toilets, $300-500 apiece, maybe "commercial strength" ones cost more... I dunno, just seems stupid.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •