I've got everything pulled together and saved in my application online except the Plans. I'm curious how accurate the plans we submit need to be compared to what is eventually built(TI has not started). Can I submit plans I came up with which have some dimensions but aren't "detailed" as they would be from an architect or should I wait another 3-4 weeks for my architect to finish the schematic design drawings and submit those?
thanks!
thanks!
Comment