We just took delivery of our 3.5 bbl 2 vessel steam skid and found that the skid did not come equipped with the steam control valves used to allow and interrupt steam entering the jackets on the vessels. This isn't the end of the world for us but being new to the business I figured it was an easy question to post here. Do other new steam systems ship with the steam control valves either installed on in packaging so all the boiler tech needs to do it plumb up the steam and condensation lines to the skid? Or do you rely on your steam boiler tech to acquire and install the steam valve system when plumbing the boiler in?