Has anyone done this and will it work? From a 3rd floor brewhouse I will be dumping spent grain down a 12 in. pvc pipe, at almost vertical 3 ft. off vertical in a 10 ft drop, then out the front of the building at a sweeping 45 degree angle into the waiting receptical below.... sure make life a bit easier! anyone have experience or opinions on this?
Thanks.
Thanks.
Comment